I picked up the first batch of flooring. It'll be installing this batch in the 3rd bedroom this weekend. I'll be laying down a layer of 1/4" cork and then laying the tongue and groove bamboo floor on top of that. I'm going to be gluing the planks together this time instead of nailing them down so that the floor is a floating floor. I'm hoping that this will speed up the install time.
oh yes, speed the install - hope that does it.
ReplyDelete