I built the shelves in units 2 and 3 instead of going shopping on Black Friday. Time well spent. I framed the shelves using 2x4's and 2x2's and used the left over siding for the surfaces.
These two units are going to be primarily filled with boxes. There will also be an unused futon and other random larger stuff. I'll be emptying the storage unit tomorrow or the next day so the shed will be able to start paying for itself!
The chronicle of the trials, tribulations, and joys of attempting to update a 1930's-era home, affectionately termed "the rat hole" because of its state of disrepair, in Kenmore, Washington.
Friday, November 25, 2011
Sunday, November 20, 2011
Shed - Part 16: Door Locks
I finished installing the frames and locks on the other 2 doors today. Now all three doors lock. Next is the fascia along the front roof line and the shelving.
Subscribe to:
Posts (Atom)