Tuesday, July 21, 2009

Slow Going

So we haven't forgotten about this blog, or the house, but we're still adjusting to life with baby. We're exhausted, but we're loving every minute of it (although some minutes are far more coherent than others).

We fully intend to start hanging the rest of the drywall for the utility closets and getting those buttoned up in the next few weeks. We'd love for the washer/dryer to be closer to the bedroom, especially now that we find ourselves doing a lot more laundry with the baby around.

Stay tuned, and we'll hopefully get back into a regular cadence of updates soon!

Thursday, July 02, 2009

Changing Table

This is kind of a crossover blog post. It's baby-related but really probably belongs with other posts of its kind (i.e. construction-related).

We'd set up a changing station for our new baby Arlo in the second bedroom before he was born. But once we had the baby, changing diapers at 3AM seemed easier to do closer to our room. Plus, a couple of friends of ours who have a child always changed their kid in the bathroom so that the child started to associate the bathroom with potty-related activities. In short, we needed to come up with a new solution.

First we tried changing the baby on the floor. This worked fine, but bending over was tough for me in the small bathroom and it was impossible for my spouse and her healing C-section incision.

I had a thought to make a fold-down changing table. After taking some measurements, I found that the space between the sink and the wall was was adequate and so was the height of the sink. Finding the time to go to Home Depot was a little challenging, but I finally did yesterday. The table is 36" wide and 18" deep and 32" high. It went together pretty quickly. The only thing I have to do is put a finish on it to protect it from torrents of pee. I'm going to use the linseed oil and beeswax finish that we got for the built-in bookshelf (that is as of yet unfinished).



Tuesday, June 16, 2009

Closet Plumbing and Drywall

The work on the closet continues...and now that the electrical is done, I get to focus on the plumbing. That means cold water, hot water, and a drain for the washer. I have to put in an emergency drain for the water heater too, but I haven't figured that one out yet. Here are some photos of the plumbing.
I used Sharkbite brand fittings this time. I've never used them before. They're more expensive, but they are really easy to put together. If I had used the Rehau fittings, I'd have to rent the installation tools for $25 a day. In the end, the Sharkbite fittings were cheaper.

After I got all the plumbing in the wall, I put in insulation (to minimize noise and to insulate the water heater room).

Here are photos of the washer/dryer closet.



And here is a photo of the water heater closet.

You may have noticed that I left some holes in the drywall where the plumbing connections are. I want to verify that there are no leaks before I seal up the wall. I'll patch the holes later after I've hooked up the plumbing.

And here is a photo of the other side of the closet wall (the den wall) before it was filled with insulation and closed up.

Monday, June 01, 2009

Wired and Waiting

I finished wiring the closet this weekend. All that's left is to connect to the service panel to make everything live. All the wire is run, all the outlets are installed, and all the lights are in and functional. I won't wire up the dryer, washer or water heater until I move the appliances. And that won't happen until the plumbing is run and connected.

I did install one piece of the plumbing puzzle. I found a valve and drain combo box at the hardware store that I liked and decided to put it in right away. The photo below is of the dryer outlet (top), the washer outlet (below the dryer outlet), and the plumbing box.


This next photo shows the water heater j-box in the water heater closet, the light in the water heater closet (it has a pull cord), and the light switch for the lights in the washer/dryer closet.


This last photo shows the lights in the washer-dryer closet. It's so nice to have light.


The circuit that the washer is on is 20 amp and has a GFCI (Ground Fault Circuit Interrupter) on it. It's always good to be safe. The outlets were easy to wire because I could just insert the wires in holes on the back of the outlet and then tighten the screw. None of this bending wires into little loops hassle. The brother-in-law would have loved it.

Tuesday, May 19, 2009

The Rest of the Hall

We accomplished two things this weekend. The first thing we did was assemble the crib. The second was to finish the demo and framing in the hallway. The demo wasn't particularly hard, but the framing was a little tricky.

We ran out of 2x4's and to save on time, money and materials, we reused some of the old cedar 2x4's that we've saved from previous demo. The old 2x4's have slightly different dimensions than new 2x4's and some are slightly warped.



Here's a panoramic stitched photo of the water heater closet.

Saturday, May 16, 2009

Bamboo Floor Preview

There was a sale on the flooring we're going to use in the living room area so we bought it. Here's a little preview of what the board look like.


We dropped off my spouse's family rocking chair this morning at an upholstery shop. It needs new fabric, but it also needs a new runner (the old one broke off and is now missing). The upholsterer is going to take the fabric off of it and then the rocking chair will go to a furniture restoration specialist where it will get a new runner and get refinished. Then the chair will come back to the upholsterer. We picked out a nice medium blue fabric with embroidered dots of brown/yellow. The whole process will likely take 3 to 5 weeks. We'll post pictures when it's done!

Wednesday, May 13, 2009

Demo(n) in the Hall

Before I started working on the hall closet, I finished cutting the drywall in the doorway between the den and the utility/entry room.



The next work to do was to demo the hall wall to make room for the doorways that will give access to the washer, dryer, and water heater.

This is what the area looked like before I took a sawzall to it.


And this is what it looked like after the saw had its fill (more next weekend).


Big difference! There are two things that my spouse and I have noticed about this new void. First it seems to have made our bedroom door not so tight in its frame, and secondly it creates a sense of doom when we walk down the hall at night without the lights on. We like the non-sticking door. We do not like the dark forbidding feeling. We're pretty sure drywall and doors will take care of the dread.

Friday, May 01, 2009

WMD (Walls Mostly Done)

Last weekend we wired the heater and tried to get all of the drywall up on the walls before the end of the day Sunday. We almost made it. We had to make the most use of the brother-in-law before he left (which happens tomorrow). Drywall installation requires both tall and short work plus lifting and cutting. These are all things he's become accustomed to.







We really got a lot done considering how much time we had (there were a few errands and emergencies that interrupted us such as car batteries and washing machines). More about washing machines later.

One of the things that didn't get finished was cutting out the arch in the doorway. We just ran out of energy and time. The doorway now reminds us of the movie Being John Malkovich.
The other thing we didn't do is fully seal up the closet wall. That was on purpose, though. We still need to demo and reframe the hall side of the closet for the doors, and it will be nice not to have to walk all the way around.


Here's a picture of a funny moment (that's probably not at all funny to anybody else).

The b-in-l was using a tool belt to hold all the drywall screws. I had bought some more screws (in a smaller box) and put them in the larger empty box so that we would know where to find them. The b-in-l ran out of screws (in his tool belt) and asked if I'd bought more screws and where they were. I said, "In the box." He didn't understand or didn't believe that there were more screws in the box the he had emptied earlier in the day. To prove that there were indeed screws in the box, I handed them to him. This photo captured either the moment of realization or the expression of incredulity at my choice of screw storage location (I'm not sure which).

Tuesday, April 21, 2009

Lights, Electrical, Den!

I'd like to start this post by showcasing the framing that the brother-in-law did. There is currently, and there will continue to be, a doorway between the utility room and the den. In order to better facilitate an easy and pleasing transition between the two rooms, we decided to widen the doorway and shift it towards the wall. Here's a photo of the newly framed doorway.


The wall next to the doorway is a location that we think is a good candidate for another heater so we're going to install one. We reframed the lower portion of the wall because we wanted to center the heater on the wall. Here are some photos of the reframed wall and of the heater installation.


You know what? It's dark in this room. It would have been a lot nicer to have been able to see what we were doing while framing for the heater. To rectify this we installed three can lights. We marked the locations and then marred our beautiful ceiling by cutting three holes in the middle of it.


I gave my b-in-l a quick lesson in outlet wiring so I could go up into the attic space to wire the lights. He installed the J-boxes and began wiring the outlets in the room on his own.




I was able to get the wiring done before the outlet wiring was down so the b-in-l got to have a little light while working.



The lights are on a 3-way switch and line up with one of the solatubes and with the center of the French doors. We only sort of meant for things to all line up. In reality, it's really more of a happy accident.

To wrap up the work for the weekend, the b-in-l installed some plates over where the wiring passes through the studs.


Then we nailed down some underlayment to span the floor seams.


My mother commented that we should be using the b-in-law for more "tall" work before he goes back to MT. I agree and now feel a little foolish having had him do so much "low" work this last week end.