The lone tulip that comes up every year.
Here's a blossom of a lipstick strawberry. They are most flavorful that the Tristar Everbearing ones we have. But they don't produce as many strawberries.
Here's a photo of the most common flower in the backyard right now.
And there is still a daffodil holding on.
They're not flowering, but here's a photo of the blueberries budding out.
The chronicle of the trials, tribulations, and joys of attempting to update a 1930's-era home, affectionately termed "the rat hole" because of its state of disrepair, in Kenmore, Washington.
Sunday, April 29, 2012
Monday, April 02, 2012
Spring Flowers 2012
A crocus and and miniature daffodil come up!
And the big white daffodils are being eaten from the inside by slugs! You have to love the Pacific Northwest!
And the big white daffodils are being eaten from the inside by slugs! You have to love the Pacific Northwest!
Wednesday, January 18, 2012
Shed in the Snow
We're having a few back to back snow storms here in the Puget Sound area. The shed looks good in the snow!
Saturday, January 07, 2012
E-Waste Disposal
So... my spouse and I have accumulated a fair amount of stuff that has become e-waste. Old CD-Rs, DVD-Rs, VHS tapes, Zip disks, 3.25" floppies, Jazz disks, cables, etc. There's just no point in keeping this stuff. But what should we do with it? Toss it in the landfill? There aren't many options.
One option is to recycle it. It costs some money, but it's not that much and it's definitely worth it. We decided to use GreenDisk.
They have an option where we can ship 25 pounds of e-waste to a GreenDisk certified processing facility where all the material broken down and recycled in the USA. We pay the shipping and the processing fee is ten dollars. We filled three twenty-five pound boxes.
And now the e-waste in not in our house or our shed!
One option is to recycle it. It costs some money, but it's not that much and it's definitely worth it. We decided to use GreenDisk.
They have an option where we can ship 25 pounds of e-waste to a GreenDisk certified processing facility where all the material broken down and recycled in the USA. We pay the shipping and the processing fee is ten dollars. We filled three twenty-five pound boxes.
And now the e-waste in not in our house or our shed!
Tuesday, January 03, 2012
Shed in Action
There have been requests to see stuff in the shed. Here are photos of units 3 and 2 with stuff in them. Unit 3 has stuff that was in the storage unit. We'll be doing a purge on unit 3 soon. Unit 2 has stuff that has been reboxed and was formerly in the second bedroom.
Monday, January 02, 2012
Friday, November 25, 2011
Shed - Part 17: Shelves
I built the shelves in units 2 and 3 instead of going shopping on Black Friday. Time well spent. I framed the shelves using 2x4's and 2x2's and used the left over siding for the surfaces.
These two units are going to be primarily filled with boxes. There will also be an unused futon and other random larger stuff. I'll be emptying the storage unit tomorrow or the next day so the shed will be able to start paying for itself!
These two units are going to be primarily filled with boxes. There will also be an unused futon and other random larger stuff. I'll be emptying the storage unit tomorrow or the next day so the shed will be able to start paying for itself!
Sunday, November 20, 2011
Shed - Part 16: Door Locks
I finished installing the frames and locks on the other 2 doors today. Now all three doors lock. Next is the fascia along the front roof line and the shelving.
Sunday, October 30, 2011
Shed - Part 15: Door Details
I finished trimming a door and installing a lock this weekend. So... other than building the shelving, one unit is done and ready for move-in!
I used aluminum 'L' to trim the edge of the door. This both stiffened the door and protected the edge. Plus it looks nice. I notched the aluminum 'L' at the corners for the first door. I think I'll miter the corners on the other two doors.
What it looks like from the outside.
I installed a dead bolt as the locking mechanism. I put in in the wall instead of putting the lock on the door .
I built a "handle" with the bolt catch in it on the door. I'll probably get around to polyurethaning the wood 'handle' when I'm done with all three doors.
And here are a couple of photos showing the completed door locked up tight.
I used aluminum 'L' to trim the edge of the door. This both stiffened the door and protected the edge. Plus it looks nice. I notched the aluminum 'L' at the corners for the first door. I think I'll miter the corners on the other two doors.
What it looks like from the outside.
I installed a dead bolt as the locking mechanism. I put in in the wall instead of putting the lock on the door .
I built a "handle" with the bolt catch in it on the door. I'll probably get around to polyurethaning the wood 'handle' when I'm done with all three doors.
And here are a couple of photos showing the completed door locked up tight.
Saturday, October 08, 2011
Shed - Part 14: Doors
I was planning on building sliding barn doors for the shed, but I couldn't bring myself to pay for the hardware that I'd need. I instead looked all over the place for some nice big offset hinges. I finally found some that were a decent price. I mounted the doors on the outside of the hinges so I needed to use a spacer to make things fit. I used a big fat washer. It was the exact same thickness as the hinge metal!
The wood I chose to use for the doors is an ACX plywood (A is a good side, C is a not so good side, X is for exterior grade glue). The doors are about three feet by seven feet. I used one of the plywood remnants as a hinge placement template so I could local the hinges on the shed.
After mounting each door, I applied a coat of exterior polyurethane to both faces and the edges. The plywood will eventually turn gray, but I think it will take a while since the doors are on the north side of the shed.
All three doors are on. I have two more coats to apply. I also have to flatten the doors. They've warped just a little bit because of the beautiful PNW autumn humidity. I have a couple of ideas on how I'd like to true them up. Now for the handle and lock hardware.
The wood I chose to use for the doors is an ACX plywood (A is a good side, C is a not so good side, X is for exterior grade glue). The doors are about three feet by seven feet. I used one of the plywood remnants as a hinge placement template so I could local the hinges on the shed.
After mounting each door, I applied a coat of exterior polyurethane to both faces and the edges. The plywood will eventually turn gray, but I think it will take a while since the doors are on the north side of the shed.
All three doors are on. I have two more coats to apply. I also have to flatten the doors. They've warped just a little bit because of the beautiful PNW autumn humidity. I have a couple of ideas on how I'd like to true them up. Now for the handle and lock hardware.
Sunday, October 02, 2011
Blueberry Harvest 2011
We picked all the ripe blueberries last week. It was a meager harvest. They're not it the best location (they need more sunlight), but that will be rectified next season since we're moving them. I think summer's late start didn't help, too. Still, they're our own and they taste really good!
Monday, September 19, 2011
Shed - Part 13: Paint
I painted the shed even though it was windy and rainy this last weekend (not really recommended). The paint brand that I painted the new parts of the house is no longer available so I had to get a match. The matched paint is close (a hair darker). The big square is the original and the small square is the new paint. The brand of paint is available in Canada, but I don't think I'll be driving to Vancouver just for paint.
I'm only painting the north and south wall of the shed right now. The east and west walls will be enclosed so they don't really need paint. One gallon of paint covered the front and back.
Here are some shots of the finished paint job.
My wife and I tried to get our two-year-old to help paint, but he didn't want to wear his painting smock (one of my old T-shirts). He went inside and took a three and a half hour nap instead.
I'm only painting the north and south wall of the shed right now. The east and west walls will be enclosed so they don't really need paint. One gallon of paint covered the front and back.
Here are some shots of the finished paint job.
My wife and I tried to get our two-year-old to help paint, but he didn't want to wear his painting smock (one of my old T-shirts). He went inside and took a three and a half hour nap instead.
Tuesday, September 13, 2011
Shed - Part 12: Glazing, Siding, and Window Unit 3
I got a lot done last weekend (and last night). The roof glazing, the siding, and the window are now all done for unit 3. Hooray! My wife and I have also decided to modify the additional sections on either end. We've decided to forgo the hot tub and enclose the west pad for gardening equipment storage (lawnmower, wheelbarrow, etc.). The east section will still be home for the table saw but will now be enclosed. Both the east and west sections will have bi-fold doors.
The color scheme will be the same as the house (blue with white trim, and natural wood for the doors).
The next steps are to paint the north and south sides of the shed and then install the sliding doors. I suspect I can get my two-year-old to help me paint.
The color scheme will be the same as the house (blue with white trim, and natural wood for the doors).
The next steps are to paint the north and south sides of the shed and then install the sliding doors. I suspect I can get my two-year-old to help me paint.
Subscribe to:
Posts (Atom)























































